Form Work for the Slab Being Done
Thursday 14th August 2019
The 'Waffle Pods" for the Slab formwork have been delivered ready for the slab. This is what the concrete is poured into/on-top of. It gives better insulation and fairs better with ground movement over time by placing the slab "onto" the ground rather than "into".
Thursday 16th/17th August 2019
the formwork for the slab is completed and ready for pouring on Monday.
The 'Waffle Pods" for the Slab formwork have been delivered ready for the slab. This is what the concrete is poured into/on-top of. It gives better insulation and fairs better with ground movement over time by placing the slab "onto" the ground rather than "into".
Thursday 16th/17th August 2019
the formwork for the slab is completed and ready for pouring on Monday.