Cabinetry is in and Wet Area Waterproofing Done!

29th November 2019

All Cabinetry has been delivered and installed!! So happy with our colour choices in the kitchen the island colour is a beautiful contrast and the cupboard profiles are exactly what we wanted to be complimented perfectly by the pewter handles.
Really happy with the laundry is such a nice size with lots of bench space. We just need to install the under overhead cabinet box shelves and it will be complete.
The main bathroom/powder room vanities are so nice with the warmer coloured wood to offset the cooler tile colour, Once installed. Really pleased we went with the floating vanities as it really keeps the floor space open and doesn't close the room off. (and so much easier to clean!!)
The ensuite vanity is perfect, loving the symmetry of the unit and again having the floating vanity gives an open floor space and leaves the room feeling bigger.


























Tuesday 26th November 2019

All waterproofing for the wet areas has been completed. Really good to see this compleated as it means tiling is starting very soon. Tile inspection has been booked in for the 3rd December 2019 and tiling will be started on the 4th.